A day porter RFP should tell bidders where to work, when coverage is needed, which tasks take priority, and how to price exceptions. Give everyone the same floor plan and response sheet so you can compare staffing and service, rather than trying to reconcile ten differently worded proposals.
Build the request around a normal week
Attach a zone list with access restrictions, opening hours and expected busy periods. For each zone, specify a routine task, its frequency and the event that triggers an extra visit. For example, ask for a lobby check after the morning rush and a restroom supply check after lunch. Mark these as examples until your site team confirms the schedule.
When requesting day porter services, ask every bidder to use your response sheet.
Turn the scope into a bid form
Ask bidders to return these fields for each shift: days, staffed hours, paid break assumptions, relief coverage, supervisor availability, equipment supplied, and exclusions. Then give them a separate field for optional event coverage. If a proposal says ‘as needed,’ ask whether that means within the staffed shift or an additional visit with a minimum charge.
| Item | What to check |
|---|---|
| Coverage | Start/end times, break coverage, days and holidays |
| Scope | Routine rounds, spill response boundaries, excluded tasks |
| Supplies | Who buys consumables, stocks carts and provides equipment |
| Escalation | Who receives urgent alerts and approves extra work |
| Pricing | Base scope, optional hours, event rates and exclusions |

Give bidders a sample route to price
Pick one floor that represents the building well. Describe where the porter signs in, where supplies are stored, how the porter moves between floors, and which rooms cannot be entered during business hours. Include the number of restrooms and breakrooms on that route. Ask bidders to explain how their shift would cover it. If one proposes fewer hours, the route description gives you a way to ask what work they expect to complete in that time.
RFP bid sheet
| Field | What bidders should return |
|---|---|
| Base shift | Days, staffed hours, breaks and relief |
| Optional work | Unit rate, minimum charge and exclusions |
| Startup | Supervisor, access needs and first review date |
Separate requirements from options
Mark each task as required, optional, or excluded. For instance, opening the lobby on weekdays might be required, support for a quarterly tenant event optional, and exterior window washing excluded. Ask vendors to show the unit and billing terms for each option. An event charge is hard to compare if one bidder quotes per hour while another assumes a four-hour minimum. Put the same assumed event duration in the bid worksheet and ask each vendor to show the extended cost.
Compare bids on one sheet
Ask for the named supervisor, the substitute process, a sample shift log and a price for the same staffed hours. Put exceptions beside each price. If one vendor includes liners and another bills them separately, request the same consumption assumption before comparing totals. During a walkthrough, give each bidder the same scenario: a spill and a restroom shortage arrive at once. Ask who handles each task and who communicates a delay.
Where the scope covers spills or access, align instructions with your site procedures and applicable walking-surface requirements. OSHA walking-working surfaces standard.
If a bidder also provides commercial cleaning services, request separate daytime and after-hours line items.
For a real example of a public bid that spells out porter hours and duties, see North Carolina’s janitorial services RFP. Use it as a reference for the level of detail, then replace the schedule with your own.
| Comparable item | Bid A | Bid B |
|---|---|---|
| Staffed hours and break coverage | Record bid response | Record bid response |
| Included supplies and substitutions | Record inclusions | Record inclusions |
| Base price, optional hours, and exclusions | Record total and exceptions | Record total and exceptions |
A walkthrough question that exposes gaps
Show bidders the route from the supply closet to the busiest restroom. Ask where the porter keeps a cart, how the relief worker gets access, and how a task is recorded when the room is occupied. Compare the answers with the shift plan. A bidder who budgets one continuous route may need to revise it once they see badge access or elevator delays.
Run a test before you score proposals
Give every finalist a sample shift log with one missed restroom check and one unresolved spill report. Ask them to walk you through how they would notify the site contact, dispatch help and document completion. Record the answers against the criteria you gave all bidders. A strong answer names the responsible role, the communication channel and what happens when the supervisor is unavailable. Ask for the same evidence from each finalist so an impressive presentation does not carry more weight than a practical plan.
Add a startup checklist to the contract
Before the first shift, confirm badge access, supply delivery, emergency contacts and a joint route review. Identify who can sign off on scope changes and agree when you will review the first week of logs. This gives both sides a concrete place to resolve problems that the walkthrough missed.
Use the scope to request a walkthrough with Service Providers Association. Request a quote.

